In May 2001 Kvaerner Process Nederlands on behalf of Atofina contracted
with GBA for the design, supply and site erection of a 121m high,
30" diameter derrick supported smokeless, low noise steam flare
with integral water seal drum.
The site was the existing Fina chemicals plant and the flare was
to be built in a very restricted area close to the existing smaller
flare and within an operating plant.
The flare was fabricated during 2001 at our works in Parma, Italy. It was shipped to ship in December 2001, it was erected by our own team in January/February 2002 and was in service by October 2002.
Design, Supply, Erection & Commissioning, a complete end to end service from GBA.
|